Héich-Qualitéit API 5CT C90 Casing Päifen Grousshandel

Kuerz Beschreiwung:

Baussenzegen Duerchmiesser
4 1/2", 5", 5 1/2", 6 5/8", 7", 7 5/8", 9 5/8", 10 3/4", 13 3/8", 16" , 18 5/8", 20", 30"
Wanddicke
5,21 - 16,13 mm


Produit Detailer

Produit Tags

API 5CT C90 Spezifikatiounen

1.Thread Typ
SC (Kuerz Ronn Fuedem), LC (laang Ronn Fuedem), BC (Buttress Fuedem), Aner Premium Fuedem
2.Längt

Längt

Projet

R1

R2

R3

Tubing

6.10-7.32m

8.53-9.75m

11.58-12.80m

Gehäuse

4,88-7,62m

7.62-10.36m

10.36-14.63m

API 5CT C90 Chemesch Zesummesetzung

Standard

Grad

Zesummesetzung (%)

C

Si

Mn

P

S

Cr

Ni

Cu

Mo

V

AIs

API SPEC 5CT
 

J55K55

0.34-0.39

0.20 bis
0,35

1,25-1,50

≤0.020

≤0,03

≤0,15

≤0,20

≤0,20

 

 

≤0.020

(37Mn5)

N80

0.34-0.38

0.20 bis
0,35

1.45-1.70

≤0.020

≤0,03

≤0,15

 

 

 

0.11
~0.16

≤0.020

(36Mn2V)

L80 (1)

≤0,43

≤0,45

≤1,9

≤0,03

≤0,03

 

≤0,25

≤0,35

 

 

 

L80(9Cr)

≤0,15

≤1.00

0,3-0,60

≤0.020

≤0,030

8 ~
10.0

≤0,50

≤0,25

0.9 ~ 1.1

 

≤0.020

L80(13Cr)

0.15-0.22

≤1.00

0.25–1.00 Uhr

≤0.020

≤0,030

12.0 bis
14.0

≤0,50

≤0,25

 

 

≤0.020

P 110

0.26-0.35

0,17 bis
0,37

0.40-0.70

≤0.020

≤0,030

0,80 bis
1.10

≤0,20

≤0,20

0.15
~0.25

≤0,08

≤0.020

(30 CrMo)

API 5CT C90 mechanesch Eegeschafte

Standard

Grad

Tensile Stäerkt (MPa)

Yield Stäerkt (MPa)

Verlängerung (%)

Hardness

API SPEC 5CT

j55

≥517

379-552

0,5%

≤241HB

k55

≥655

379-552

0,5%

N80

≥689

552-758

0,5%

L80(13Cr)

≥655

552-655

0,5%

P 110

≥862

758-965

0,6%

API 5CT C90 Casing Tubing Stol Faarf Code

Numm

j55 k55 N80-1 N80-Q L80-1 P 110
Gehäuse eng hell gréng Band zwee hell gréng Bands eng hell rout Band eng hell rout Band + eng gréng Band e roude Band + eng brong Band eng hell wäiss Band
Kopplung ganz gréng Kopplung + eng wäiss Band ganz gréng Kopplung ganze roude Kopplung ganze roude Kopplung + eng gréng Band ganz rout Kopplung + eng brong Band ganz wäiss Kupplung

API 5CT C90 Spezifikatioune Typ vun Enn-Finish

Etiketten Aussen- Duerchmiesser T&C Wanddicke Typ vun Enn-Finish
(d/mm) (kg/m) (t/mm)
1 2       J55/K55 M65 L80/R95 N80-1/Q C90/T95 P 110 Q125
2004/1/2 9.5 114,3 14.14 5.21 PS PS - - - - -
10.5 114,3 15.63 5,69 PSB PSB - - - - -
11.6 114,3 17.26 6,35 PSLB PLB PLB PLB PLB PLB -
13.5 114,3 20.09 7.37 - PLB PLB PLB PLB PLB -
15.1 114,3 22.47 8,56 - - - - - PLB PLB
5 11.5 127 17.11 5,59 PS PS - - - - -
13 127 19.35 Uhr 6,43 PSLB PSLB - - - - -
15 127 22.32 7,52 PSLB PLB SLB PLB PLB PLB  
18 127 26,79 9.19 - PLB SLB PLB PLB PLB PLB
21.4 127 31,85 11.1 - PLB PLB PLB PLB PLB PLB
23.2 127 34,53 12.14 - - PLB PLB PLB PLB PLB
24.1 127 35,87 12.7 - - PLB PLB PLB PLB PLB
2005/1/2 14 139,7 20.83 6.2 PS PS - - - - -
15.5 139,7 23.07 6,98 PSLB PSLB - - - - -
17 139,7 25.3 7.72 PSLB PLB PLB PLB PLB PLB -
20 139,7 29,76 9.17 - PLB PLB PLB PLB PLB -
23 139,7 34,23 10.54 - PLB PLB PLB PLB PLB PLB
26.8 139,7 39,88 12.7 - - - - P - -
29.7 139,7 44,2 14.27 - - - - P - -
32.6 139,7 48,52 15.88 - - - - P - -
35,3 139,7 52,53 17.45 - - - - P - -
38 139,7 56,55 19.05 - - - - P - -
40,5 139,7 60,27 20.62 - - - - P - -
43.1 139,7 64,14 22.22 - - - - P - -
2006/5/8 20 168,28 29,76 7.32 PSLB PSLB - - - - -
24 168,28 35,72 8,94 PSLB PLB PLB PLB PLB PLB -
28 168,28 41,67 10.59 - PLB PLB PLB PLB PLB -
32 168,28 47,62 12.06 - - PLB PLB PLB PLB PLB
7 17 177,8 25.3 5,87 - - - - - - -
20 177,8 29,76 6,91 PS PS - - - - -
23 177,8 34,23 8.05 PSLB PLB PLB PLB PLB - -
26 177,8 38,69 9.19 - PLB PLB PLB PLB PLB -
29 177,8 43,16 10.36 - PLB PLB PLB PLB PLB -
32 177,8 47,62 11.51 - PLB PLB PLB PLB PLB -
35 177,8 52,09 12.65 - - PLB PLB PLB PLB PLB
38 177,8 56,55 13,72 - - PLB PLB PLB PLB PLB
42,7 177,8 63,55 15.88 - - - - P - -
46,4 177,8 69,05 17.45 - - - - P - -
50.1 177,8 74,56 19.05 - - - - P - -
53,6 177,8 79,77 20.62 - - - - P - -
57.1 177,8 84,98 22.22 - - - - P - -
2007/5/8 24 193,68 35,72 7.62 - - - -   - -
26.4 193,68 39,29 8.33 PSLB PSLB PLB PLB PLB - -
29.7 193,68 44,2 9,52 - PLB PLB PLB PLB PLB -
33,7 193,68 50,15 10,92 - PLB PLB PLB PLB PLB -
39 193,68 58,04 12.7 - - PLB PLB PLB PLB PLB
42,8 193,68 63,69 14.27 - - PLB PLB PLB PLB PLB
45,3 193,68 67,42 15.11 - - PLB PLB PLB PLB PLB
47.1 193,68 70,09 15.88 - - PLB PLB PLB PLB PLB
51,2 193,68 76,2 17.45 - - - - P - -
55,3 193,68 82,3 19.05 - - - - P - -
2007/3/4 46.1 196,85 68,61 15.11 - - P P P P P
2008/5/8 24 219.08 35,72 6,71 PS PS - - - - -
28 219.08 41,67 7.72   PS - - - - -
32 219.08 47,62 8,94 PSLB PSLB - - - - -
36 219.08 53,58 10.16 PSLB PSLB PLB PLB PLB PLB -
40 219.08 59,53 11.43 - PLB PLB PLB PLB PLB -
44 219.08 65,48 12.7 - - PLB PLB PLB PLB -
49 219.08 72,92 14.15 - - PLB PLB PLB PLB PLB
2009/5/8 32.3 244,48 48,07 7,92 - - - - - - -
36 244,48 53,58 8,94 PSLB PSLB - - - - -
40 244,48 59,53 10.03 PSLB PSLB PLB PLB PLB - -
43,5 244,48 64,74 11.05 - PLB PLB PLB PLB PLB -
47 244,48 69,95 11,99 - PLB PLB PLB PLB PLB PLB
53,5 244,48 79,62 13,84 - - PLB PLB PLB PLB PLB
58,4 244,48 86,91 15.11 - - PLB PLB PLB PLB PLB
59,4 244,48 88,4 15.47 - - - - P - -
64,9 244,48 96,58 17.07 - - - - P - -
70,3 244,48 104,62 18.64 - - - - P - -
75,6 244,48 112,51 20.24 - - - - P - -
2010/3/4 32,75 273,05 48,74 7.09 - - - - - - -
40,5 273,05 60,27 8,89 PSB PSB - - - - -
45,5 273,05 67,71 10.16 PSB PSB - - - - -
51 273,05 75,9 11.43 PSB PSB PSB PSB PSB PSB -
55,5 273,05 82,6 12.57 - PSB PSB PSB PSB PSB -
60,7 273,05 90,33 13,84 - - - - PSB PSB PSB
65,7 273,05 97,77 15.11 - - - - PSB PSB PSB
73,2 273,05 108,94 17.07 - - - - P - -
79,2 273,05 117,87 18.64 - - - - P - -
85,3 273,05 126,94 20.24 - - - - P - -
2011/3/4 42 298,45 62,5 8,46 - - - - - - -
47 298,45 69,95 9,53 PSB PSB - - - - -
54 298,45 80,36 11.05 PSB PSB - - - - -
60 298,45 89,29 12.42 PSB PSB PSB PSB PSB PSB PSB
65 298,45 96,73 13.56 - - P P P P P
71 298,45 105,66 14.78 - - P P P P P
2013/3/8 48 339,72 71,43 8,38 - - - - - - -
54,5 339,72 81.11 9,65 PSB PSB - - - - -
61 339,72 90,78 10,92 PSB PSB - - - - -
68 339,72 101.2 12.19 PSB PSB PSB PSB PSB PSB -
72 339,72 107.15 13.06 - - PSB PSB PSB PSB PSB
16 65 406,4 96,73 9,53 - - - - - - -
75 406,4 111,62 11.13 PSB PSB - - - - -
84 406,4 125.01 12.57 PSB PSB - - - - -
109 406,4 162,21 16.66 P - P P - P P
2018/5/8 87,5 473,08 130,22 11.05 PSB PSB - - - - -
20 94 508 139,89 11.13 PSLB PSLB - - - - -
106,5 508 158,49 12.7 PSLB PSLB - - - - -
133 508 197,93 16.13 PSLB - - - - - -

  • virdrun:
  • Nächste:

  • Schreift äre Message hei a schéckt en un eis